Proper installation of bolts and nuts is an important part of ensuring the stability of the connection. Here are some steps and precautions: Cleaning: Before installation, make sure that the connection surface, bolt and nut holes are clean. Remove any dust, oil and other debris that may affect the quality of the connection. Check fittings: Check that the bolts and nuts match the design requirements and ensure that the fittings are not damaged or deformed. Using faulty accessories can affect the reliability of the connection. Proper preload: When tightening bolts and nuts, the appropriate preload force needs to be applied. This can be done by rotating the bolts and nuts until there is a tight contact between the connecting parts. The preload should be adjusted according to the design requirements and specifications to provide the required connection strength. Use the right tools: Select the appropriate tools and wrenches to tighten the bolts and nuts. Using the right tools ensures correct torque and even force distribution, avoiding over-tightening or under-tightening. Uniform tightening sequence: For connections with multiple bolts, they should be tightened in an alternating, diagonal sequence to ensure uniform force distribution and prevent deflection or deformation at the joint. Thread lubrication: An appropriate amount of thread lubricant can be used during the fastening process to reduce friction and wear. However, care should be taken to avoid excessive use of lubricant, which may lead to excessive tightening. Regular inspection and maintenance: After connection, check the tightness of the connection regularly during use. Re-pretighten bolts and nuts if necessary to maintain the reliability of the connection. The above are some basic steps and precautions for the correct installation of bolts and nuts in general. Ensure operation in accordance with design specifications and requirements, and strict control of torque and preload to ensure the stability and reliability of the connection. If there are special requirements, it is recommended to refer to the relevant technical standards or consult professionals.